As Dubai’s first modern port and situated along traditional trading lanes, Mina Rashid is an attractive site for non-containerized cargo, especially for break-bulk and RoRo vessels.
DP World’s – UAE Region FZE plans to conduct a Condition Survey of Mina Rashid Dolphins and Marine Ramp near Berth 35. The objective of the Survey is described as:
ARTI's participation in the Mina Rashid project was characterized by a comprehensive scope of activities aimed at enhancing the infrastructure. Through a meticulous review of available surveys and studies, underwater inspections, and on-site assessments, ARTI aimed to determine the scope of future engineering works. The project also included the preparation of a Technical Assessment Report, Retrofit/Rehabilitation Design Report, and corresponding drawings, culminating in the development of a precise Bill of Quantity.
ARTI's multifaceted approach ensured a systematic and detailed analysis, laying the groundwork for the effective retrofitting and rehabilitation of Mina Rashid's infrastructure.