We provided Gama Power Systems with marine engineering design and consultancy services for the cooling water systems at Erzin CCGT Power Plant. ARTI Proje designed all the components for the seawater intake/discharge system.
During the construction stage, we additionally provided construction consultancy as part of our scope of services to the client. Including the hydraulic and dilution analyses on the site, all the structural designs, as well as technical documentation and specifications, were prepared by our company.
Client: Akenerji and Gama Power Systems
Year: 2013